Architecture

School in Hradec Králové

Daniel Puszkar
VSB - Technical Univerzity in Ostrava, Faculty of Civil Engineering, Department of Architecture
Czech Republic

Project idea

THE PROPOSED OBJECT WORKS ON A FLOOR PLAN WITH A SPACIOUS RECTANGULAR ATRIUM THAT BECAME THE HEART OF THE OBJECT. INDIVIDUAL CLASSES, OFFICES AND GAME ROOMS ARE LOCATED AROUND THE OUTER EDGE OF THE BUILDING AND USE EASTERN AND SOUTH SUNLIGHT, WHICH ENSURE SUFFICIENT LIGHTING OF THE SPACE FOR TEACHING. A PROTECTIVE IS BUILT AROUND THE BUILDING, DEFINED BY INFINITE RHYTHMIC RANGE
METAL COLUMNS.

Project description

THE CURRENT SCHOOL BUILDING suffers from LACK OF SPACE. THE EXISTING CLASSES DO NOT HAVE SUFFICIENT DIMENSION FOR THE REQUIRED NUMBER OF PUPILS AND THERE ARE NO SPACES FOR RELAXATION OR REHABILITATION ROOMS. THE PROBLEM IS ALSO THE ROOM OF THE CERAMIC WORKSHOP, WHICH IS LOCATED ON THE FIRST FLOOR, AND IS AVAILABLE FOR MANY CHILDREN WHO ARE IN A WHEELCHAIR. THE CURRENT BUILDING WAS TO MAINTAIN THE CONTEMPORARY BUILDING AND ATTEMPT TO BUILD A NEW FLOOR. THIS OPTION WOULD BE A VARIANT IF IT WAS POSSIBLE TO USE THE EXISTING BASICS.

Technical information

THE OUTER COVER IS A DIFFERENT GRID OF A SKELETON STRUCTURE WHICH MAY ALLOW THE USE OF SMALLER DIMENSIONS SUPPORTING COLUMNS. WALL SUPPORT STRUCTURES ARE USED INSIDE THE BUILDING, WHICH WILL BE AT THE SAME TIME OF THE CONSTRUCTION STRENGTHEN. METAL COLUMNS, DEFINING THE WALK, DO NOT PERFORM THE SUPPORTING BUT COMPOSITION.

Copyright © 2024 INSPIRELI | All rights reserved. Use of this website signifies your agreement to the Terms of Use, Privacy Policy, and use of cookies.